| Funding | Honeywell |
| Role | Project trainee |
| Team size | 1 in-charge, 1 engineer and 1 trainee |
| Skills used | LabVIEW; Analog circuit design; Digital circuit design; Hardware testing; Calibration |
| Period | Sep 2008 — Jul 2009 |
| Master's thesis | Open |
This project Designing a factory floor tester for a heating ventilation and air conditioning (HVAC) controller and a remote monitoring unit (RMU) is carried out by Honeywell to test its products on the production line.