Funding | Tata Power-DDL |
Role | Site cum planning engineer |
Team size | 1 Project manager, 1 engineer and work force |
Skills used | Foundation; Erection of metal structures; Stringing; Testing and Commissioning; Project planning; Material Acquisition; Inventory Control; Site management |
Period | Nov 2003 — Nov 2005 |
Bachelor's thesis | Erection of 66 KV double circuit (D/C) transmission line (TL) and its accessories |
The project, Construction of the 66 KV double circuit transmission lines at Bawana, Delhi, is contracted to L&T by Tata Power Delhi Distribution, formarly known as North Delhi Power Ltd. (NDPL), to strengthen North Delhi power distribution system.
The Institution of Engineers (India) considered this project as a Bachelor’s thesis.